Energy engineering consultancy · since 2014

Engineers who take clean energy from permit How we work to first power.

Solar, wind and storage developers bring us a site and a deadline. We handle the studies, the grid connection and the engineering, then stay on site until the plant is exporting.

Trusted by developers and utilities
NORDVIND helia Maren Utilities KESTRELpower

From the first site visit to the first kilowatt-hour.

Four stages, one team. You can bring us in for one of them, but projects go faster when the people who did the studies also sign off the switch-on.

01

Site & feasibility

Yield and wind studies, land and environmental screening, grid capacity checks. A clear go or no-go in weeks, not quarters.

Energy yieldLand screeningGrid capacity
02

Permits & grid connection

We prepare the applications, sit with the network operator and keep your place in the queue moving.

Planning consentGrid studiesOperator liaison
03

Engineering & procurement

Electrical and civil design, equipment selection, tender packages and contractor evaluation, written so your lenders can read them.

EPC packagesOwner's engineerLender reports
04

Construction & commissioning

Our engineers live near the site while it's built. Quality checks, testing, and the paperwork that gets you to commercial operation.

Site supervisionTestingCOD support

Plants that are exporting right now.

A few recent projects where we stayed from the first study to the day the plant went live.

Showing 3 of 140+ delivered projectsRequest the full reference list

We spend our weeks on windy, muddy sites so your project spends less of its life waiting in a grid queue.

Ingrid Halvorsen · Founding engineer

Twelve years, measured in megawatts.

Numbers from our project log, updated every quarter.

0GW

of solar, wind and storage capacity engineered.

0+

projects taken from study to operation.

0%

of our grid applications approved on the first submission.

0

countries with an Astergrid engineer living near site.

How a project moves with us.

Every stage ends with a document you can hand to your board or your bank.

Step 01 / 04On site
STEP 01

Walk the land

Two engineers spend a few days on the site. Soil, slope, access roads, the nearest substation and the neighbours.

  • Site visit report with photos
  • Constraint map
  • First yield estimate
2–3 weeks
STEP 02

Secure the connection

We model the export, prepare the grid application and keep talking to the operator until there's a date on paper.

  • Load-flow and short-circuit studies
  • Application package
  • Connection offer review
3–9 months
STEP 03

Engineer every row

Layouts, cable routes, substations and the equipment list, priced by contractors we've already worked with.

  • Detailed design set
  • Tender and contractor shortlist
  • Lender's technical report
2–4 months
STEP 04

Switch it on

We supervise the build, run the tests and sign the commissioning documents. Then we hand over a plant your operator understands.

  • Weekly site reports
  • Commissioning tests
  • Handover manual
6–14 months

Notes from the field.

What we're learning about grids, permits and the weather. Written by the engineers who were there.

Free first review

Have a site in mind? Send us the coordinates.

We reply within two working days with a short note on what we'd check first, and who on our team would walk the site with you.

projects@astergrid.energy
Thanks, this is a demo form. Nothing was sent.